Piling work Product List and Ranking from 4 Manufacturers, Suppliers and Companies

Piling work Product List

1~4 item / All 4 items

Displayed results

SKxTECH Co., Ltd. Construction Achievements

Kanto area - Numerous construction achievements including base station construction for domestic mobile carriers!

We would like to introduce the construction achievements of SKxTECH Co., Ltd. In steel pipe rotary insertion, we have a track record of construction for pile lengths and excavation depths of approximately 20 meters. With the use of down-the-hole hammers, we have numerous achievements for pile lengths and excavation depths of about 15 meters. We select the construction method in advance based on the site conditions and ground data. We can provide one-stop support for each process from temporary works, excavation to pile installation. 【Features】 - Strong against water inflow due to alternating steel pipe insertion and middle excavation. - No collapse of the borehole walls. - Strong in construction at locations where water inflow is anticipated, such as sandy or soft ground. - The strength can be secured without a root cap due to the insertion of steel pipes. *For more details, please download the PDF or feel free to contact us.

  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Example of MLT construction method: "Landslide Prevention Pile Work"

Introducing a case of landslide prevention pile construction using the MLT method! We will showcase a site where the construction has been completed!

This is an introduction to a construction example of "landslide prevention pile work" using the "MLT method." In recent years, with sudden heavy rains and typhoons causing rainfall far exceeding expectations, measures against landslides and debris flows have become urgent. "Landslide prevention pile work" involves driving steel pipe piles to suppress landslides. A landslide occurred in the Katanoe area of Sado City, spanning 100 meters in width and 200 meters in height, where 71 prevention piles were installed in two tiers. Additionally, this method was adopted in the emergency landslide work related to disasters in the Nogema area by the Nagaoka Regional Promotion Bureau of Niigata Prefecture. It can be utilized in many locations, so please contact us first. 【Construction Example 1】 ■ Client: Niigata Prefecture Sado Regional Promotion Bureau ■ Project Name: Katanoe Landslide Disaster Prevention Work ■ Conditions: Installation of 71 prevention piles in two tiers, shortened construction period *For more details, please visit our website or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Pipe Pile Construction: "Ultra Pile Method - Gaia Pile Method"

With the low noise/low vibration rotary insertion method, pile construction is achieved without residual soil! It also contributes to environmental conservation by not using industrial waste.

The Ultra Pile Method and Gaia Pile Method utilize a unique stop management system that eliminates variability caused by construction machinery and workers, resulting in a significant increase in bearing capacity. This is a high-precision foundation pile technology, certified by the Minister of Land, Infrastructure, Transport and Tourism. 【Features】 ■ Environmental Conservation Rotary penetration method: Achieves pile construction with no residual soil. No industrial waste (such as ground treatment materials or cement milk) is used, and no leftover soil is generated. ■ High Bearing Capacity The unique shape of the pile tip provides a large bearing capacity. Economic pile design is possible. ■ Low Noise and Low Vibration Ideal for pile construction in urban areas, densely populated residential areas, and indoors. ■ High-Performance Construction Machinery Compact yet capable of high torque construction machinery that can adapt to limited construction conditions such as narrow access roads, construction sites, and sites with overhead restrictions (such as factories). *For more details, please contact us or download the catalog.

  • Earthworks
  • Pile and foundation work
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Earth Drill Type Enlarged Base Pile Method "SY Method"

A cast-in-place concrete enlarged base pile method that allows for a fivefold increase in bearing capacity even in narrow sites.

The "SY Method" is a new cast-in-place concrete enlarged base pile method that achieves a large bearing capacity by excavating the enlarged base diameter to more than twice the shaft diameter. With a mechanical bucket, it is possible to construct enlarged base piles with five times the bearing capacity even in narrow sites. It also accommodates high-strength concrete with a design standard strength of up to 45 N/mm². 【Features】 ■ Maximum enlarged base diameter φ4700mm ■ 4.84 times high bearing capacity ■ Suitable for narrow sites ■ Compatible with all casing ■ Reliable construction management *For more details, please download the PDF or contact us.

  • Earthworks
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration